Vacuum excavation supports important district heating development at Liverpool’s Royal Liver Building
5th Nov 2025

VAC UK recently completed vacuum excavation works in Liverpool city centre, operating beside the iconic Royal Liver Building on the city’s historic waterfront.
At the iconic the Liverpool docks location, the team excavated a series of trial holes on behalf of a leading energy company developing district heating networks across Merseyside. The project forms part of wider plans to provide low-carbon heat and hot water to homes and businesses in the region.

Given the age and heritage of the docks around Liverpool, the area contains a complex network of underground infrastructure, much of which remains unmapped. The trial holes were excavated to gather intelligence about existing buried services, enabling engineers to safely plan the routing of new utilities.
Vacuum excavation reducing service strike risks
Using vacuum excavation technology allowed the team to expose underground services safely and efficiently while significantly reducing the risk of service strikes. This approach improves safety for operatives and helps avoid the cost and disruption that can occur when underground assets are damaged.

Vacuum excavation also offers a minimal operational footprint. On this project, the VAC truck was able to operate within a footprint no wider than the vehicle itself, reducing the need for road closures and helping to minimise disruption for local residents, businesses and traffic in this busy waterfront location.
Projects such as this demonstrate the value of vacuum excavation in complex urban environments, particularly in areas with historic infrastructure where safe digging and precise excavation are essential.
Back to News









