VAC UK delivers on M6 drainage repairs
29th Jul 2026

A blocked or damaged drain can quickly become a serious safety hazard on the motorway network. Standing water increases the risk of aquaplaning, reduces visibility through spray and, in some cases, can even damage vehicles.
Rapid intervention is therefore vital.
VAC UK recently enabled repairs to damaged drainage close to the M6 Junction 2 Coventry interchange.
Working overnight to minimise disruption to road users, the VAC UK team safely vacuum excavated a 1.5m-deep, 2.5m-long pit to expose the damaged clay pipe. Highway engineers replaced the damaged section with new plastic pipe before the excavation was reinstated.

Despite the ground having been baked hard by the recent hot weather, the entire operation was completed in just six hours.
VAC UK leading vacuum excavation growth
Fast deployment, a compact working footprint and self-contained spoil management continue to make vacuum excavation the go-to solution for highway drainage repairs. It enables engineers to work safely around buried infrastructure, minimise disruption and return roads to service as quickly as possible.
Patrick Curran, Director at VAC UK, said: “Highway drainage failures can quickly become a safety issue, so responding rapidly and working efficiently is essential. Vacuum excavation allows us to expose buried assets safely and quickly giving highway engineers the access and time they need to complete repairs quickly.
“Projects like this demonstrate why vacuum excavation has become such an effective solution for maintaining and protecting the UK’s strategic road network.”

Back to News









